Bengaluru's Day 3 Of Flooding - Power Cuts, Water Supply Hit

Tuesday, 6 September 2022newsdesk
Bengaluru's Day 3 Of Flooding - Power Cuts, Water Supply Hit
Several areas of Bengaluru remain waterlogged following heavy rainfall that has bared the damage caused by unplanned development in the rapidly growing city.

New Delhi, 06 September 2022

As per news report of NDTV, on the third day of flooding, several areas remain waterlogged. Traffic movement has slowed down to a crawl as some key roads are inundated. The flooding of the mega IT hub for the second time in a week has led to bizarre scenes of people boarding tractors and cranes to make their way to their workplace through the flooded roads. A 23-year-old woman died of electrocution on a waterlogged road yesterday, news agency ANI has reported. Akhila, who worked in the administrative department of a school, was returning home when her scooter skidded. She tried to grab an electric pole and got a shock.

Source - NDTV

Read More >>

If you like the story and if you wish more such stories, support our effort Make a donation.